The PM Toolkit
A collection of tools for Project Management

    This page includes 84 different templates, forms, checklists, and other management guides designed to facilitate Project Delivery.   Interactivity at this site will provide users the opportunity to download portions of the PM Toolkit and to provide input to CICA on their refinement, as well as any additions that they might offer.  This PM Toolkit is a dynamic document and will be updated and revised as refinements are received and screened by CICA's "PM Processes for Multiple/Small Projects" Program Planning Team.  All of the PM Toolkit files were gathered and solicited from the construction industry.   However, they are not suited for all Project Management applications and their effectiveness may vary depending on company and project needs or characteristics.

Downloading Files
    The files available for downloading are categorized and grouped into specific project phases such as planning, objective setting, design managment, quality management, etc.  To download files, click on the desired category in the left margin and then click on the specific file name.  A description of each file is provided for you to browse before you download.

Construction PM Software Links
   
Click on "Sites" under PM Software in the left margin or the button below to access links to sites that provide demos and downloading of numerous Project Management software.  This is a great reference to research Project Management software and their capabilities before you purchase.

Click here to go to the PM Software

File Critiques and Feedback
   
To provide critiques and feedback on downloaded files located by this page, click on "Critique" in the left margin or the button below.  Instructions on how to critique the files will be provided on the feedback form. Please, take a minute to fill out the form.  We appreciate any feedback regarding this web page and its files that you are willing to provide.

Click to go!

Submitting Your Own Project Management Tools
   
If you have a new and different Project Management Tool that you would be willing to share with us and have posted on this web page, please click "Submit Tool" in the left margin or the button below.  CICA will review your form for possible posting.  Please attach your tool's file to the e-mail and provide a short explanation of your tool and how you implement it.  We welcome and appreciate all submittals to help build and improve this web page.

wpe81.gif (2146 bytes)

Downloading Requirements
    To view and use the templates, you need Microsoft's Office 95 (Excel and Word)or higher.  If you have another version or use other programs, you can download viewers for Excel and Word. Click in the image below to download the viewers:

 Click to DownloadDownload Now!

File Name

Description

Planning

Facility Planning.doc

Checklist containing the conceptual requirements, AFE generation and approval, accounting, and organization aspects of facility planning used by the facilities engineering group. It also assigns responsibilities and dates to each checklist item.

PEP checklist.doc

A project execution plan is the overall project planning document. It will consist of sections that address such topics as communications, materials management, and safety. This form can be used as a checklist to select the appropriate major divisions of the project execution plan.

GENERAL Conditions.doc

This form is a contractor's project planning document for establishing the project's service needs. It is submitted to and used by the Purchasing Department for procurement.

Proj Execution C_L.doc

This form is a checklist for the project team leader executing the project. It is a planning checklist for the project execution and assigns responsibilities and dates to each checklist item.

Bidprep.doc

Planning document for the project team developing the bid package that assigns responsibilities and dates for each checklist item. It also serves as a responsibility chart for the project estimator.

Potential Task List.Doc

The project execution plan will address the assignment of various project management tasks. This list contains typical project management tasks and serves as a checklist.

PPP quality index.xls

Pre-project planning index scoring card for evaluating the quality of major planning phases of the project.

Organization

Project Team Charter.doc

There is a trend toward managing projects with empowered teams that consist of representatives of the owner, designer, constructor, and (when appropriate) the construction manager organizations. It is important that the team have a mission statement and be empowered to make decisions. This document organizes the project team charter.

TEAM MEETING.doc

Team discussions and assignments made at team meetings should be documented and distributed in the form of meeting minutes or a team meeting report. It is important that this be managed in a timely fashion to be effective. This document can help to organize and manage team meeting information.

Responsibility by phase.xls

Phase responsibility matrix for large projects assigning responsibility for the following phases: Team Selection, Conceptual Planning, Schematic Design, Design Development, Contract Documents, Bidding, and Construction.

Respons Matrix Construction.xls

Construction phase responsibility matrix for a large project focusing on the construction phase.

Small Projects Respon Mat.xls

Responsibility matrix designed for small projects.

Objective Setting

Objectives Checklist.doc

The project team should draft a set of project objectives. These objectives need to be aligned with the corporate business objectives of the represented companies. This form suggests areas to be addressed when developing the project objectives statement.

Objectives Matrix.doc

Report card taken by the project team to measure team progression at certain project intervals. Helps to identify weak areas in obtaining objectives.

Scope Definition

Scope Development Checklist.doc

Checklist used to facilitate scope definition for the objective setting, conceptual, and AFE phases of a project.

Design Management

Engineering Checklist.doc

Checklist containing project engineering and design items that assigns responsibilities and dates.

Cost/Schedule Management

PROJECT CONTROL LIST.doc

Regardless of whether or not formal CPM scheduling tools are being utilized, it is helpful if the project manager develops a set of critical milestones and tracks the attainment of those milestones on either a computer-based or paper-based system. This document lists the critical milestones tracked from notice to proceed to final payments.

Cost Report.xls

Spreadsheet that tracks the original budget against various project change orders.

Cost to Complete Summary.xls

Spreadsheet tracking contract status, cost to date, and remaining project costs with manual adjustments.

Executives PROJECT SUMMARY.xls

Spreadsheet for a project engineer or manager of projects within a company to track and summarize several different projects regarding status, schedule, cost, change orders, and contract value, etc.

Estimate.XLS

Spreadsheet indicating the WBS coding for estimated overhead items with line items extensions for quantities, costs, subtotals, taxes, insurance, and totals. It also calculates cost per SF.

Small Project Forecast.doc

Form used to track small projects in an existing industrial facility by the resident design and construction engineer. Tracks the budget, forecasted costs, and actuals.

LABOR COST CURVE.doc

Spreadsheet that assigns estimated weekly labor costs to a project and graphs the weekly cumulative costs. This curve is used to track against actual costs throughout the project duration and helps to determine a cost performance index.

Billing Curve.doc

Spreadsheet assigning forecasted and actual monthly billing costs to a project. It tracks the project billing status by graphing the planned billings, actual billings, and actual costs on one graph. This curve is used to track costs throughout the project duration and helps to determine a cost performance index.

Small Project Statusing.doc

Form used to pull data from an existing accounting system and track project performance.

Gantt Chart by MSProject.doc

Sample Gantt Chart developed in MS Project for scheduling the construction of a garage. Also indicates the durations and WBS codes for each activity.

Information Management

Requests and Changes Log.doc

Contractors may request changes in the scope of work. The owner or owner's representative may or may not approve these change requests and issue a corresponding change order. Change requests and change orders can be tracked using a database file. Fields in the file can include work description or code, approval status, work status, basis of payment, schedule impact, and dollar amount. This document tracks these items.

PROJECT FILE SYSTEM.doc

Checklist for setting up a standard system for filing project information. Aids in standardizing the filing system's information throughout a company.

PM Internal Coord Guide.doc

Guide for assigning responsibility within a project for the project team. Good for when the project involves part-time staffing and resources such as estimating and scheduling. Helps to communicate the needs of the project to other departments.

Project Manual.doc

For a relatively small project, the project manual is a single three ring binder that contains the Project Control List, subcontracts, schedules, owner invoices, job cost reports, and the major project management forms and logs. This form specifies the suggested contents of the project manual.

Project Execution Progress Report.doc

Checklist containing key items, resources, and events to be included in a project execution progress report.

Transmittal.doc

When the project manager transmits plans, shop drawings, subcontract forms, test reports, change orders, or samples to other parties, a letter of transmittal is included. This is a template to generate the letter of transmittal.

RFI.doc

A template form such as this can be used by the constructor to request information from the owner's representative. The owner's representative can respond to the request using the same form.

Submittals Log.doc

The submittal log tracks the status of shop drawings, test reports, samples and other documents that have been submitted to and received from other entities.

Sub_Supplier List.doc

Document used by the project manager to determine how to package subcontractor jobs. Helps to insure all parts or aspects of the project are addressed and covered. Great communication tool and document for reference throughout the project duration.

Letter of Transmittal.doc

When the project manager transmits plans, shop drawings, subcontract forms, test reports, change orders, or samples to other parties, a letter of transmittal is included. This is a template to generate the letter of transmittal.

Letter of Intent.doc

Document providing guidelines on how to write a letter of intent. Letters of intent must be converted to contract ASAP. A letter of intent template is also included.

openissues.doc

Action list document used to manage priorities within a project by assigning responsibilities and dates to each item.

Openissues.xls

Action list spreadsheet used to manage priorities within a project by assigning responsibilities and dates to each item.

Backcharge.doc

Form used to notify subcontractors or supplies of claims against them.

cleanup notice.doc

Form that puts subcontractors on notice regarding failure to perform cleanup responsibilities on a project.

phone conversation record.doc

Form used to record telephone conversations and document information discussed. Can also be used as a confirmation document for key pieces of information. Should only record facts and not opinions for court admissibility.

Change Management

Change Order.doc

This template can be used to generate the change order document. Also serves as a notice for a change in the scope of work.

Field_Change_Auth.doc

Form used to authorize the constructor to perform work differently for what is specified in the contract documents.

COLog.doc

Form used to log and track project change order numbers, descriptions, values, dates, and approvals.

T&Mticket.doc

Form used to request reimbursement for change order or field authorization work that is to be performed on a cost reimbursable basis.

Pending C O Log.xls

Spreadsheet used to track submitted pending change orders to determine their status.

Request for Change Order.doc

Letter template requesting a change order.

Request C-O Log.xls

Spreadsheet used to track requested change orders and document status, dates, values, and descriptions.

Request CO Log Example.xls

Example spreadsheet used to track requested change orders and document status, dates, values, and descriptions.

Change Order Summary.doc

Form used to summarize the total cost effect of a particular change order to date.

Summary Example.doc

Example form used to summarize the total cost effect of a particular change order to date.

Change Trend Notice.doc

Form that tracks particular changes to date to forecast project trends and effects.

Comment on Change.doc

Document published in Georgia Construction Law discussing construction change management. Provides good advice on how to deal with and manage change.

Materials Management

Procurement Checklist.doc

Checklist containing project procurement actions and items and assigns responsibilities and dates.

Procurement Plan.doc

Document similar to a project manual used to plan procurement activities. Includes a project overview, cost savings and avoidance, procurement strategy, projected distribution of expenditures, equipment sourcing list, project challenges, and quality assurance.

BIDTAB.XLS

This form can be used to compare the unit price quotations of multiple suppliers. It is best utilized in a spreadsheet format. Unit prices that vary significantly from the norm can be identified and follow-up contacts initiated with the supplier if necessary.

Contract and Purchase Order Log.doc

This is a database file or list of subcontracts and purchase orders issued by the contractor. The file contains information related to the purchase order or subcontract including CSI specification section, responsible party, dates, costs, and change status. Database sorts can generate multiple useful reports.

Sample Request for SubBid.doc

This form is used to solicit bids from subcontractors. An important part of the form is a clearly worded scope of work statement.

SUBMIT.xls

The submittal log tracks the status of shop drawings, test reports, samples and other documents that have been submitted to and received from other entities.

SUBMITALOGA.xls

The submittal log tracks the status of shop drawings, test reports, samples and other documents that have been submitted to and received from other entities.

Submittal Log.xls

The submittal log tracks the status of shop drawings, test reports, samples and other documents that have been submitted to and received from other entities.

EQUIPLOG.doc

Form used by field supervisors to track rented equipment on the job site. Includes date received, vendor information, planned and actual return dates, and off rent control numbers.

Concrete Placement CARD.xls

Checklist to insure all preliminary actions are covered before concrete is placed. Also records and documents conditions when concrete is placed.

ConcreteLog.xls

This form can identify differences between takeoff or estimating quantities of concrete and the quantities actually put in place.

Request for Subcontractor CO.doc

This form is used to solicit change quotation bids from subcontractors. An important part of the form is a clearly worded scope of work statement.

Safety

Safety Planning C_L.doc

Checklist for preparing a safety plan for a project.

Hazard Analysis.doc

Checklist for performing a thorough hazard analysis for a project along with recommended solutions.

SAFETY AUDIT.doc

Periodic site inspections using forms such as this can document good and poor safety practice. (This is a small portion of an actual form.) Can help to identify trends throughout the project duration.

Safe Work Permit.doc

Form used to insure pre-task safety training has been accomplished and documented.

Lockout Audit.doc

Form used to insure pre-task lockout items have been accomplished and inspected.

Training Log.doc

The names of persons that received safety training should be documented. This forms tracks the required documentation. These documents help to mitigate any possible problems resulting from an OSHA inspection.

Injury Report.doc

Form used to track information around a particular job injury.

Substance Abuse Program.doc

Form used for subcontractor documentation of drug screening prior to project attendance.

Safety Inspection.DOC

Checklist including key items to look for when conducting a safety inspection.

Safe Acts Card.doc

Scoring card index system to track safety trends on a project. Includes instructions for scoring an index.

Quality Management

Quality Audit.doc

This is another variation of a performance evaluation form. Similar forms can be used to evaluate contractor performance to make incentive payments.

Contractor Performance Evaluation.doc

Throughout the project, and/or at the end of the project, the owner's representative may wish to evaluate the performance of the contractor. Similarly, the contractor or construction manager may wish to evaluate the performance of subcontractors.

Sub Performance Evaluation.doc

Throughout the project, and/or at the end of the project, the owner's representative may wish to evaluate the performance of the contractor. Similarly, the contractor or construction manager may wish to evaluate the performance of subcontractors.

PROJECT VISIT report.doc

Audit checklist for looking at key project items and documenting the project visit and evaluation. Includes recommendations.

Start-Up

Project StartupC_L.doc

Checklist for items that need to be planned for project startup and close-out.

INSPECTION REPORT.doc

Checklist used for inspecting the completed facility.

QUALITY REVIEW GUIDE.doc

Document outlining the procedure to follow in the early design phase and pre-construction phase to improve the quality of projects by getting input from crafts, SHEA, contractors, and the business representative before the design is started.

Warranty Log.doc

Form used to log and track equipment or systems with warranties and terms.